It is suitable for the racking and unloading operation of standard rail bogie, which is used in the new construction or overhauling of rail vehicles to elevate a single bogie to a suitable height, so as to facilitate the decomposition, cleaning, assembling, measuring and checking operation of various components on the bogie.
The equipment adopts pit-type installation, no matter in working or non-working condition, there is no pit on the plant floor.
The equipment adopts modular design, the whole equipment is divided into four pieces (two outer frames, one base, three connecting rods, one drive shaft), which is convenient for field installation.
Equipment jacking for built-in electric drive structure, wheel-to-wheel rim positioning, with a V-shaped groove positioning bogie air transport; does not damage the plant's original track (not cut the track).
The equipment adopts PLC control.